Exhibitors for the category "1.16. - Sustainability, power engineering and hydroelectric power plant"

Hala 2 - C 9
• We solve the cause of the mould intrusion and insulate the walls from the inside.
Hala 5 - D 2
Hala 1 - A 12
Hala 5 - A 5
Hala 3 - C 13
Hala 5 - A 4
• 3D digital twin scan of buildings and other objects (not only) in the construction industry.
Hala 2 - B 10a, Hala 2 - B 10